Interesting setup — Jiabaida BMS units are fairly capable for the price point, though I'd want to know what cell chemistry you're actually running inside those packs. The BMS brand tells you relatively little without knowing the underlying cells.
Running two separate 12V banks rather than paralleling them is a sensible approach if you're keeping them isolated for redundancy purposes — that's essentially what I do with my tiny house setup, where I keep a secondary bank specifically for emergency backup loads. Means if one BMS trips or a cell goes out of balance, you're not dragging the whole system down.
A few things I'd want to understand better about this configuration:
- Communication between the BMS units and any inverter/charger — are these passive BMS units or do they support CAN/RS485? Victron kit plays nicely with communicating BMS, but dumb BMS units can cause nuisance disconnects
- Cell balancing strategy — passive or active? At 100Ah this matters less, but worth knowing
- What load management sits between the two banks? Are you switching manually or using an automatic transfer switch of some sort?
The Morgantown location suggests you're on the US side of things, so grid tie regulations will differ from what most of us deal with over here, but the battery fundamentals are identical.
Worth checking what continuous and peak discharge ratings the Jiabaida units are rated to — their spec sheets can be optimistic. Would be curious what you're actually running on these banks. Anyone else here had long-term experience with Jiabaida specifically? I've only seen them mentioned briefly on here before.