Interesting timing on this thread — I've been going back and forth on whether to run a parallel pair of Multiplus II 5kVAs in my shepherds hut conversion rather than just stepping up to a single larger unit.
Can I ask those who've done parallel Victron setups — is the MK3-USB interface and VE.Configure absolutely mandatory before they'll play nicely together? I've read conflicting things. Some say you can get them "talking" via VE.Bus without touching the config, others say they'll just sit there doing nothing or worse, fighting each other.
Also, a few specific questions:
- External transfer switch — did you use a dedicated ATS contactor or did you find a specific brand that plays well with the Victron ecosystem? Struggling to find clear UK supplier recommendations.
- Ground relay wiring — is there a gotcha here when you're on a site with an existing earth rod rather than a floating system?
- Phase pairing — do both units need to be identical firmware versions, or is there some tolerance there?
My setup will be running off a 48V Fogstar Drift LiFePO4 bank with a mix of shore power and solar input, so the parallel inverter capacity would mainly be needed for occasional high-draw tools during the build phase.
Has anyone done this successfully on a narrowboat or off-grid building where grid code compliance isn't really a factor? Wondering if that simplifies things at all.