Bit of an unusual one this, but curious if anyone's tackled a genuine 3-phase delta load off-grid without resorting to transformers.
Context for me: looking at potentially powering some older 3-phase workshop equipment on the boat (yes, I know — don't ask how that conversation started). The kit in question wants 230V line-to-line in a delta configuration, which is where it gets awkward with Victron's multi-unit 3-phase setups.
The standard Quattro 3-phase arrangement gives you 400V line-to-line with 230V phase-to-neutral — i.e., standard European star/wye. That's fine for most things, but a true delta load expecting 230V L-L is a different beast entirely.
From what I can work out, your options are roughly:
- Step-down transformer on each phase (messy, lossy, expensive)
- Single-phase workaround if the load can be rewired
- Specialist inverter that actually outputs lower line-to-line voltage natively
Has anyone actually done this cleanly? I've seen some discussion about using three smaller single-phase inverters in an open-delta arrangement but I'm not convinced that's stable under varying loads.
Fogstar and similar battery suppliers aren't the issue here — it's purely the AC output side. Victron's own documentation goes a bit quiet on this specific scenario.
Would be interested to hear from anyone who's powered genuine 3-phase delta machinery off a battery bank — narrowboat, off-grid building, workshop, whatever the setup. What did you actually end up doing?