Been thinking about this a lot recently after reading about someone stateside running a similar-style build on a converted coach — twin Multiplus II 5kVAs feeding a 240V split-phase panel, which obviously doesn't directly translate here, but the underlying topology got me thinking about what a proper large-scale UK conversion would look like.
For a build of that scale in the UK you'd be looking at a single 230V leg obviously, but paralleling two Multiplus II 5000s still makes sense if you've got serious loads — think induction hob, air source heat pump, angle grinder running simultaneously. That's not unrealistic in a shepherd's hut or skoolie conversion that's someone's permanent residence.
Where I think a lot of people underestimate (and it sounds like this bloke did too before catching himself) is the MPPT sizing. Eight 590W bifacial panels is pushing 4.7kWp. You cannot lump that through a single SmartSolar 100/50 and call it done. You're looking at needing either a 250/100 or splitting arrays across two controllers for proper harvest, especially on those rare glorious Scottish summer days where bifacial rear gain is actually doing something useful.
20kWh of storage is solid — assuming that's Fogstar or similar lithium rather than lead, you've got genuine overnight resilience.
My question for the thread: has anyone here actually paralleled two Multiplus IIs in a mobile/semi-permanent UK build and run them through a proper consumer unit with RCD protection? Curious how the DNO interaction works when you're grid-independent but occasionally connecting to a hook-up point. The ESS configuration in VE.Configure gets a bit murky around that.