Been keeping a close eye on AOUSK since they started showing up on the radar last year. That price point is genuinely interesting — the V2 revision apparently sorted some of the early communication gremlins that people were reporting with the V1 units over on the US forums.
What I'd want to know before pulling the trigger is how well the BMS plays with Victron kit via CAN bus. That's where so many of these Chinese server rack units fall over in practice. Fogstar's stuff integrates beautifully, but they're at a very different price tier obviously.
A few things worth the community digging into:
- Cell grade — are we looking at genuine Grade A cells or the usual marketing fluff?
- Cycle rating — the spec sheets often quote 4000+ cycles but the small print tells a different story
- Parallel expansion — can you stack more units later without the BMS throwing a tantrum?
The AC+CB pricing structure is a bit unusual too. Presumably that's with a circuit breaker pre-fitted? Would save messing about sourcing a suitable DC breaker separately, which adds up.
Anyone actually taken delivery of V2 units yet? Real-world capacity tests under load are what matter, not the bench figures. A 100Ah cell that only delivers 85Ah under a proper discharge tells you everything.
Would love to see some actual data from folk running these. If the CAN bus integration holds up and the cells are honest, at that price you're looking at serious value compared to anything available this side of the Atlantic. Drop your experiences below if you've got them.