So I've been scratching my head over something similar with my cabin setup and wondered if anyone's gone down this road.
I'm looking at running two Multiplus II 5kVA units in parallel (single phase) to cover the cabin and potentially the garden office as well. The question that's keeping me up at night is around the AC output and grid connection arrangement when using an external transfer switch rather than relying purely on the built-in switching.
Specifically — is it acceptable practice to combine the AC outputs from both units onto a single busbar alongside the grid input feed? I know Victron's documentation talks about this in the context of three-phase setups with larger inverters, but the guidance feels a bit vague when you're doing single-phase parallel with an external transfer switch thrown into the mix.
My concerns are:
- Are there any timing/sync issues if both Multiplus units aren't switching simultaneously?
- Does the external transfer switch need to see the combined output, or just the master?
- Any UK-specific regs (Part P, DNO notifications etc.) I should be aware of before wiring this up?
I've had a dig through VictronConnect and the Victron Community forums but the answers seem geared toward much bigger commercial installs or three-phase setups on the continent.
Anyone running a similar parallel single-phase arrangement in the UK — particularly off-grid with occasional grid top-up? Would love to know how you've physically wired it and whether your DNO had anything to say about it.