Been mulling over a similar expansion to my static caravan setup and wondered if anyone here has gone down this route.
Currently running a Victron Multiplus-II 48/3000/35 (single phase, not the three-phase stack the Fronius crowd often use) with a Fronius Primo 3.0 on AC OUT, feeding a Fogstar 48V LiFePO4 bank. Works a treat under MG50 grid code with feed-in limiting configured through VEConfigure.
Now I want to bolt on a second Fronius — likely another Primo or possibly a Primo 4.6 to pull more off the south-facing roof panels. The question is whether to link them via Solar NET (Fronius's own daisy-chain communication bus) or just run them as completely standalone units both sitting on AC OUT.
My concern with standalone is that the Multiplus has no visibility of what each inverter is individually doing — it just sees total AC IN power. Feed-in limiting becomes a bit of a blunt instrument.
With Solar NET, the Fronius DataManager coordinates between units, and if you're also running Node-RED on a Cerbo GX, you can theoretically get much finer control. But I've read conflicting things about whether the second Fronius gets its own DataManager card or piggybacks off the first.
A few specific questions:
- Has anyone run dual Fronius units on a single-phase Multiplus setup (rather than three-phase)?
- Does Solar NET genuinely improve feed-in limiting behaviour, or is it marginal?
- Any gotchas with the MG50 grid code when both inverters are producing simultaneously?
Interested to hear what others have done — particularly anyone