Been wrestling with this exact dilemma for my garden office setup. Currently running a 48V system with a pair of Fogstar Drift 100Ah LiFePO4 batteries and a Victron MultiPlus, and I've been tempted to add a spare 50Ah battery I've got sitting around from a previous build.
From what I've read, mixing capacities can work if the chemistry and voltage are matched, but the BMS on each unit will still protect itself independently — which means the smaller battery could hit its cutoff threshold well before the larger ones, effectively taking itself out of the loop early. You'd essentially be paying for capacity you're not fully using.
A few questions I keep coming back to:
- Does anyone have real-world experience running mismatched capacities on the same bus bar, rather than just theory?
- Is there a meaningful difference between connecting them in parallel at the battery level vs. letting the inverter/charger handle it?
- Would it be worth just selling the 50Ah and putting that money toward a matched unit?
I'm also wondering whether the EG4 BMS handles this differently to, say, a Victron Smart Lithium setup — the EG4 ecosystem seems to have its own quirks when it comes to battery communication.
Anyone here actually running a mixed bank long-term? Curious whether it causes headaches down the line or whether it's genuinely fine in practice once everything's dialled in.