Has anyone else hit a wall trying to get Dynamic ESS actually running rather than just configured?
I've gone through the whole setup on my GX device — grid code, feed-in settings, schedule — everything looks correct in the Dynamic ESS section. But the moment I hit enable on the Dashboard Controls it just sits there saying "Loading" indefinitely. No error codes, no timeout message, nothing useful in the VRM logs that I can spot.
My setup is a Victron Multiplus-II with a Fogstar Drift 200Ah LiFePO4 on the narrowboat, connected to shore power on the marina. I'm wondering if it's something specific to how my system is registered in VRM — maybe a site configuration issue rather than anything hardware related?
A few things I'm trying to narrow down:
- Does Dynamic ESS actually require a specific minimum firmware version on the CCGX/Cerbo? I'm running a fairly recent one but not the absolute latest
- Is there a known issue with marina/non-standard grid connections not being recognised properly?
- Could the BMS communication be blocking something even though everything shows green?
I've seen a few threads on the Victron Community forum mentioning similar "Loading" hangs but most relate to three-phase setups or solar installs, which isn't my situation.
Has anyone successfully got DESS working on a single-phase narrowboat or motorhome-style setup in the UK? Particularly curious whether there's a manual workaround or a specific VRM setting that's easy to miss during initial configuration.