Yes, absolutely top balance first — don't skip it, you'll regret it.
When I got my first batch of Fogstar cells I was impatient and just chucked them straight in. BMS was tripping constantly for the first week because the cells were all over the place. Wasted days of good sun basically doing nothing.
Top balancing gets everything sitting at the same voltage before you start cycling them. Your BMS can then do its job properly rather than fighting against wildly uneven cells from day one.
The process is pretty straightforward:
- Charge each cell individually to 3.65V (for LFP)
- Let them sit until the current drops right off
- Then connect them all up and let them settle overnight
Takes a bit of patience but honestly worth every hour. My Victron Lynx setup has been rock solid ever since I started doing it properly with new cells.
Only exception I'd say is if you're buying pre-matched/pre-balanced cells from a reputable supplier — even then I'd still check voltages on arrival and at least parallel them up overnight before building the pack.
What cells are you getting? Grade A or the cheaper B-grade stuff? Makes a difference to how much variance you might be starting with. Some batches I've seen arrive surprisingly close, others are a right mess.
Anyone else had good or bad experiences skipping the top balance stage? Curious whether it's just my luck or a common issue.