Interesting topic - slightly outside my usual UK stomping ground but the principles are universal enough to be worth chipping in.
The "critical loads" panel concept is something I wish was more standardised over here. In the UK we tend to bodge together a consumer unit with a manual changeover switch and call it a day, whereas the Californian approach of having a properly defined sub-panel for essential circuits is actually quite elegant from a system design perspective.
For anyone looking at compliant systems in that space, the Victron MultiPlus-II seems to crop up constantly in builds I've seen documented online - the transfer switching and ESS functionality ticks a lot of the regulatory boxes. Sol-Ark and EG4 are popular Stateside for this kind of thing too.
What I'm curious about from those with direct experience:
- How strictly are inspectors actually enforcing the compliance requirements? I've heard it varies wildly by county.
- Are there battery chemistry preferences being pushed by AHJs, or is LFP pretty much accepted everywhere now?
- Does the backup gateway / automatic transfer requirement complicate off-grid or hybrid setups significantly?
From my own experience building a hybrid system here (Victron + Fogstar Drift LFP), the automatic transfer side is genuinely the trickiest bit to get right - not technically difficult, but there's a lot of nuance in the settings to make it seamless.
Would be good to hear from anyone who's actually pulled permits and had inspections signed off on these systems.