Been down a similar rabbit hole recently, and thought it was worth raising here because I don't see it discussed much in a UK context.
I'm in the process of documenting my garden office setup for compliance purposes — not grid-tied in the traditional sense, but I do have a Victron Multiplus-II and a Fogstar Drift lithium bank, and I wanted to make sure everything was above board before my electrician signs it off.
The French Consuel process (their equivalent of our NAPIT/NICEIC certification route) apparently requires specific technical dossiers for ESS installations with no grid export — essentially proving the system is genuinely zero-export rather than just claiming it. Got me thinking: are we being rigorous enough about this on the UK side?
With G98/G99 notifications and the DNO paperwork, it feels like there's a process, but I've spoken to two different sparks who gave me completely different answers about what's actually required for a non-export ESS in a garden building. One said it was straightforward permitted development territory, the other said I needed a full G99 application regardless of the battery-only setup.
Has anyone here gone through a formal compliance route for an off-grid or genuinely non-export ESS — particularly in a garden office, cabin, or similar outbuilding? Curious whether anyone's had an inspector actually scrutinise the Victron ESS assistant config or the CT clamp wiring to verify zero-export.
Would love to know what documentation others have pulled together — especially if your setup is similar (Multiplus-II, no solar export, just load shifting from grid).