Bit of a rabbit hole I've fallen down this week — anyone actually tried running two mismatched Victron units in a split-phase arrangement, specifically different wattage ratings?
I've got a Multiplus-II 3000 sitting in my cabin build and a spare Phoenix 2000 gathering dust in the van, and I'm half-tempted to lash them together rather than sell the Phoenix on eBay for a tenner.
Victron's own docs are pretty clear on parallel config needing matched units, but split-phase feels like a different beast — you're not really asking them to share load symmetrically in the same way, are you? Theoretically the 180° phase offset is doing the heavy lifting, not load balancing between identical units.
Key questions I can't find answered anywhere:
- Does VE.Bus firmware actually reject the handshake if the unit IDs don't match?
- Will the sync signal hold stable under asymmetric loads across the two legs?
- Anyone tried this with a VE.Configure workaround or custom assistant?
In practice I suspect Victron's answer is simply "buy another Multiplus, peasant," but I'd rather hear from someone who's actually smoked a fuse finding out empirically.
Worth noting this is mostly academic for a 3-phase UK grid-tie situation anyway — most of us off-grid lot are running single-phase 230V like sensible people — but for a large cabin or outbuilding with big motor loads it's a genuinely useful topology.