Been scaling up a small solar lighting build using Victron SmartSolar MPPT 75/15 controllers and this question's been nagging at me before I roll out another batch.
Standard wisdom says: battery first, then panels — always. But if you've already pre-configured the battery voltage in the VictronConnect app before the unit even sees a live connection, does that change anything? My gut says no, the connection order still matters for protecting the MOSFET circuitry, regardless of what the firmware thinks it's looking at. The controller still needs to detect and confirm battery voltage on startup before it should ever see panel input.
Tried skipping the order once by accident on a 12V LiFePO4 setup (Fogstar cells, naturally) and the controller threw a fit — not catastrophically, but enough to make me paranoid about doing it at scale.
That said, I've seen people in various threads swear blind that pre-setting via Bluetooth sorts everything. Feels like someone's going to brick something expensive and learn the hard way.
For those of you deploying multiple units — are you strictly enforcing battery-first on every install, or has pre-configuration given you any wiggle room in practice? Keen to hear if anyone's actually stress-tested this properly rather than just going by feel.
Would be especially useful from anyone who's done larger rollouts — solar street lighting, shed installs, that sort of thing — where connection discipline across multiple systems gets a bit messy in the field.