Really interesting build concept — parallel inverters are genuinely underrated for redundancy, and 30kWh gives you serious headroom.
A few things worth thinking through before committing:
Phase sync is the big one with parallel PowMr units. They can work together, but the sync cable implementation on some of their models is a bit inconsistent. Worth digging into the specific firmware version yours are running — there were some known quirks in earlier builds that caused one unit to drop out under heavy load switching.
Battery configuration matters enormously at this scale. Are you going LiFePO4? At 30kWh you'll want proper BMS comms with the inverters, not just voltage-based cutoffs. Pylontech or a DIY pack with a decent JK BMS would be my starting point. If you're going with something like Fogstar Drift cells, make sure your busbars are properly rated — at 12kW combined draw you can be pulling 1,000A+ at 12V, which is where things get expensive if undersized.
What voltage system are you running — 24V or 48V? At this capacity I'd strongly push toward 48V if you haven't already committed. The cable sizing difference is significant.
Also curious what your charge sources look like — solar array size, any grid tie or generator backup?
Been running a single 5kW inverter setup in my motorhome for a couple of years so parallel territory is slightly beyond my personal experience, but I've followed a few forum threads here where members have made it work brilliantly. Would love to see your wiring diagram when you get to that stage — reckon others here would find it really useful documentation.
What's the end use case — static off-grid home, or something more mobile?