Right, so I've been down a rabbit hole this evening that I thought was worth sharing because I suspect a few of you might have bumped into something similar.
My setup is single-phase rather than 3-phase, but I've been experimenting with Dynamic ESS on my Victron MultiPlus-II and noticed something peculiar when my Fogstar-paired battery bank is nearly full and prices go negative on Agile.
When both my PV sources are generating — roof panels via a grid-tie inverter and a small Renogy MPPT — the system seemingly throttles one source down to almost nothing. We're talking figures so low they'd barely charge a phone. Pointlessly low.
My theory, and I'd love someone more technically-minded to either confirm or laugh at me, is that Dynamic ESS gets confused about where power is actually coming from and starts issuing bizarre curtailment instructions to avoid grid export during negative pricing. Noble intention, chaotic execution.
The Cerbo GX logs are... not exactly chatty about why it's making these decisions. Classic Victron — brilliant hardware, documentation written by someone who enjoys suffering.
Has anyone else seen weird limiting behaviour when two generation sources are active simultaneously under Dynamic ESS?
Particularly curious whether this is a firmware thing (I'm on 3.75) or a fundamental limitation in how the algorithm handles multiple simultaneous inputs. If it's the latter, that's going to be a problem as more of us add secondary generation sources to our shepherds hut-style setups.
Would genuinely appreciate hearing from anyone running a similar multi-source arrangement. Pull up a virtual chair.