Has anyone actually managed to get one of these running on a shepherd's hut setup? I've been looking at the Eco-Worthy 5000W split phase unit as a potentially cheaper alternative to a Victron Multiplus, but the operating manual reads like it's been run through Google Translate three times and then back again.
A few things I'm genuinely puzzled about:
- The manual references 120V AC split phase throughout — is there a 230V single phase version, or is this unit fundamentally designed for the US market?
- The battery charging parameters seem vague. I'm running a 48V Fogstar lithium bank and want to make sure the absorption/float voltages can be properly configured
- There's a section on "generator priority mode" that I can't make head nor tail of
I've seen a couple of YouTube walkthroughs but they're all American installs, which doesn't help much when you're trying to work out UK grid-tie legality and whether it plays nicely with a 230V single phase supply.
The price point is tempting — roughly a third of what a comparable Victron setup would cost — but I'd rather pay the premium if this thing is going to cause headaches. Has anyone on here actually benched one, or is it mostly theoretical interest?
Would love to see a proper comparison between this and the Victron or Renogy equivalents if anyone's done the legwork.