So this is going to sound familiar to a few of you I reckon...
I've been running three Victron SmartSolar MPPT 450/100s on my static caravan setup for about eight months now, all talking to a LV-Hub with a bank of Pylontech US3000C batteries behind it. Mostly it's been rock solid — genuinely impressed with how it all hangs together.
But last Tuesday morning I wake up, kettle goes on, and nothing. Zilch. Open VictorConnect and all three MPPTs are throwing Error #67 — "No BMS" essentially. Production completely blocked, sunny day wasted.
What had happened, best I can tell, is the LV-Hub lost its comms link to the Pylontechs overnight. Maybe a loose RS485 cable, maybe a firmware hiccup, I'm still not entirely sure. Power-cycling the whole system (batteries last, batteries first back on) cleared it... eventually. Third attempt.
A few things I'm now wondering:
- Has anyone found a reliable way to monitor LV-Hub comms status before it cascades into an Error #67 situation? Something in Venus OS perhaps?
- Do the MPPTs need individual BMS-connected settings adjusted, or does the LV-Hub handle all that centrally?
- Anyone running Fogstar or alternative Pylontech-compatible packs seeing the same fragility with the hub comms?
It's not a disaster — everything came back — but losing a full day of generation because of what amounts to a handshake problem feels avoidable. Would love to know if others have nailed down a more robust setup.