Bit of a niche one this, but I've been down a rabbit hole with my Victron MultiPlus-II ESS configuration and I think others running similar setups might have hit the same wall.
So here's the scenario. I've got the MultiPlus-II 48/5000 paired with a Fronius inverter on the AC output side. Everything ticks along nicely until I start looking at how the ESS actually hits its grid setpoint. I noticed it would only properly regulate to my target import/export figure when I had AC-coupled PV feed-in enabled. Switch that off, and the regulation goes a bit wonky — it's like the ESS logic can't quite settle on the setpoint without that feed-in pathway being active.
Now I appreciate this is technically a single-phase MultiPlus on what's nominally a three-phase supply situation, which adds another layer of complexity. The DVCC settings and the grid setpoint interaction don't always behave the way the Victron documentation implies they should.
My Fogstar batteries are perfectly happy throughout, so it's not a BMS comms issue. This feels more like an ESS firmware quirk or possibly a configuration order-of-operations thing.
Has anyone else seen ESS grid setpoint regulation behave differently depending on whether feed-in is active? I'm particularly curious whether tweaking the minimum SOC or the grid setpoint value itself changes anything, or whether this is just a known limitation when you're running single-phase in a three-phase environment.
Would love to know if anyone's found a workaround that doesn't involve leaving feed-in permanently enabled.