Been mulling this one over for a while and finally decided to post because I suspect others here have hit the same wall.
My static caravan setup runs a Victron MultiPlus-II GX 48/5000 alongside a small string inverter (roughly 2kW of panels on the roof). Everything — the Multi, the PV inverter, and all the caravan loads — feeds back to a single 32A breaker on a subgroup rather than having its own dedicated connection back to the main incomer. Running a fresh cable to the meter tails simply isn't practical on a static.
The question I keep circling is around CT clamp placement in VEConfigure. The docs seem to assume you'll always clamp to the main grid feed, measuring net import/export at the boundary point. But if your entire island — inverter, PV, and loads — lives behind a subgroup breaker, does clamping the CT on that subgroup actually give the MultiPlus meaningful data to work with for ESS/DESS logic? Or does it end up chasing its own tail, effectively measuring its own output and confusing the charge/discharge decisions?
I've had a read through the Victron ESS design guide and it's not entirely clear on this edge case. Some of the Venus OS community threads hint that the grid meter needs to "see" the inverter on one side and grid on the other — which wouldn't be true here.
Has anyone in a similar fixed-pitch or static setup managed to get sensible behaviour from this configuration? Curious whether a Victron ET340 or even a Carlo Gavazzi placed on the subgroup gave usable results, or whether it just falls apart in practice.