Really interested in this topic as it's something I've been wrestling with on my boat setup.
Running a Victron MPPT and Cerbo GX alongside a third-party inverter/charger, and the VRM energy flow diagram is honestly a bit of a mess for my installation. It doesn't represent what's actually happening — certain loads don't show up properly, and the inverter just appears as this vague blob rather than something meaningful.
Has anyone managed to get a cleaner representation through the VRM portal when mixing Victron monitoring kit with non-Victron inverters? I'm wondering whether it's worth:
- Setting up a custom MQTT feed to pull in the missing data
- Using something like Node-RED on the Cerbo to fudge the device roles
- Just accepting the limitations and switching to a separate dashboard (Grafana etc.)
The frustration is that Victron's monitoring hardware is genuinely excellent, but the VRM diagram feels like it's only really polished when you're running a 100% Victron stack. Which is fair enough commercially, but on a boat you often end up with whatever inverter fits the space and budget.
Would love to know if Victron have any plans to allow user-defined nodes or device roles in the flow diagram. Even something basic — let us label a device and assign it an icon — would make a huge difference for mixed installations.
Anyone else running a hybrid setup like this? What have you done to get meaningful monitoring without ripping out and replacing working kit?