Been down a bit of a rabbit hole lately thinking about this, ever since I started planning to tie my boat's Victron Multiplus setup into a shore power arrangement that might eventually involve some grid export.
The European grid code situation is genuinely fascinating — and a little alarming. Germany's been setting the pace for years, but Spain's recent requirements have caught my eye. It made me realise how patchwork this all feels across the continent, and how easily UK installers and DIYers can get caught out, especially post-Brexit when we've drifted away from some of the EU frameworks but haven't always replaced them with anything cleaner.
For those of us with hybrid setups — I'm thinking boat, cabin, EV charging all potentially talking to each other — the G98/G99 engineering recommendations from Energy Networks Association are the UK's answer to this. But honestly, how many people here have actually read them cover to cover? I'll admit I've skimmed them at best.
What I'm specifically curious about is:
- Frequency response settings — are you manually configuring these on your Victron kit, or leaving defaults?
- Anti-islanding protection — how many DIY installs actually have this properly sorted?
- DNO notification — have you gone through the formal process, or is it all sitting in a grey area?
I suspect a lot of off-grid setups that could export occasionally are operating in a regulatory no-man's-land. Not necessarily dangerously, but not formally compliant either.
Would love to hear from anyone who's navigated the G98/G99 process properly, or who's looked at what Spain and Germany are doing and drawn lessons for UK installs.