Interesting topic this one — been thinking along similar lines for my own setup.
Currently running a 3-phase Multiplus-II arrangement for the garden office and EV charging, with a fourth unit I've been considering repurposing as a dedicated emergency/standalone leg rather than just leaving it as a cold spare. The German discussion around using a separate MP as an isolated "L4" emergency circuit is something I haven't seen discussed much on UK forums, which is a shame because it's genuinely useful for resilience.
My main question for anyone who's done something similar: how are you handling the Fronius integration on the AC-coupled side? I've got a Fronius Primo I'd like to bring into the mix but the frequency-shift power control behaviour gets a bit unpredictable when you start adding asymmetric loads across phases — particularly with the EV charger pulling hard on one phase.
On the narrowboat I keep things simpler (Victron MPPT + Fogstar lithium, no inverter stacking), but the off-grid house setup is where complexity creeps in fast.
A few things I'm trying to work out:
- Whether the standalone emergency MP needs its own VRM instance or can sit on the same GX device
- How others are managing ESS vs off-grid mode when you want one phase truly islanded
- Any UK installers who've actually commissioned a setup like this rather than just theorising about it
Would be good to hear from anyone running a hybrid Victron + Fronius island system, especially if you've gone beyond the standard 1:1 or 3-phase templates in VEConfigure.