Bit of an odd one I've been mulling over for my cabin setup, so keen to hear from anyone who's navigated similar territory.
I'm running a Victron SmartSolar MPPT RS 450/100 alongside a Multiplus-II, and I've been going back and forth over how to properly configure the earthing and isolation arrangement when an external CPI (or equivalent monitoring relay) is brought into the mix. The RS 450/100 has integrated galvanic isolation, which is great, but it does complicate things when you're trying to satisfy an installer or, in some cases, a DNO or building control officer who wants to see documented earthing topology.
In the French thread that inspired this discussion, the installer had declared an IT earthing scheme on their compliance paperwork — which is broadly similar to what some of us run off-grid in the UK, where there's no TN-S or PME reference to bond to. That's actually quite relevant if you're running a fully islanded system with no grid connection at all, which several of us here do.
My specific question: does anyone have practical experience documenting the earthing arrangement for a Victron RS + Multiplus combo when submitting for building regs or any formal sign-off in the UK? I know most of us don't need CONSUEL (that's a French thing), but building control can still ask awkward questions if you're wiring a permanent structure.
Also curious whether anyone's added a Fronius inverter into a Victron ecosystem — the AC coupling side of things with frequency shifting adds another layer to the earthing conversation.