Been running a JBD BMS on my narrowboat for the better part of two seasons now, paired with an SRNE inverter-charger, and the combination has been... mostly fine, with a few quirks worth discussing.
The main thing I've noticed is the SRNE doesn't always play nicely when the JBD trips on low voltage. The inverter throws a fault rather than gracefully shutting down, and getting it to restart sometimes requires a full power cycle. Not ideal at 11pm on a dark stretch of canal.
I've seen some folk use a Victron SmartShunt in the loop to give better SOC monitoring, which then at least gives you more warning before the BMS actually pulls the plug. That's probably my next addition honestly.
The communication side is where it gets interesting — the JBD has BLE and RS485 outputs, but SRNE uses their own protocol for their battery comms port. Anyone managed to get actual CAN or RS485 chatter working between the two? I've had a dig through the JBD app settings and nothing obvious jumps out.
For what it's worth, my setup is:
- 4S 280Ah LiFePO4 cells with JBD 200A BMS
- SRNE 3000W inverter-charger
- Fogstar cells (which have been rock solid)
Wondering if anyone else has hit the fault-on-BMS-trip issue, or found a workaround beyond just setting conservative voltage cutoffs in the SRNE itself to avoid the JBD ever needing to step in. That's my current bodge and it feels like exactly that — a bodge.
Would love to know what others are doing. Surely someone's cracked this pairing properly?