Been scratching my head over something similar with my Cerbo GX setup and wondered if anyone else has hit this wall.
Running a slightly more modest system than some of you — pair of Multiplus-IIs, a couple of MPPT 250/100s, Fogstar Drift lithium bank — but I added a second EM540 recently to monitor my workshop loads separately from the main static caravan circuits. Ever since, the "Grid" and "Loads" figures on the dashboard just don't add up properly.
The Cerbo seems to lose track of power when you start stacking multiple energy meters. Like it's not aggregating them the way you'd expect. My critical loads show fine, but there's always a chunk of watts that basically disappears from the calculations — nowhere in the VRM portal either.
Few things I've been looking at:
- Role assignment — did you set each EM540 correctly? Grid, Generator, AC Load, etc.
- Phase mapping — single-phase UK setups can get confused if the meter roles aren't matched to the right AC input/output
- Firmware — Cerbo firmware has had some quirks with multi-meter setups, worth checking you're on latest
With five meters all feeding data simultaneously I'd imagine the polling or calculation logic might just be getting overwhelmed or mis-attributing figures.
Anyone running multiple EM540s successfully on a Cerbo here? Would love to know how you've got the roles configured — especially if you're splitting sub-circuits across outbuildings or annexes like I am. Victron's documentation is decent but goes a bit vague once you're beyond two meters.