Anyone else been down the rabbit hole of trying to get the Virtual Switch and PV Inverter Assistant playing nicely together on a Multiplus 2?
Running a 48V system on the narrowboat — Victron Multiplus 2, Cerbo GX, Fogstar Drift LiFePO4 cells, and a Victron MPPT on the main array. All lovely and well-behaved. Then I bolted on a second AC-coupled inverter for a second array and suddenly the whole thing has the personality of a disgruntled badger.
The issue I keep bumping into: the Virtual Switch logic seems to get confused when the PV Inverter Assistant is also trying to manage frequency shifting to curtail the AC-coupled array. They're both poking the Multiplus at the same time and the result is... chaotic. Grid relay chattering, unpredictable behaviour when the batteries hit absorption — the usual carnival.
Victron's own documentation basically hints that mixing assistants can cause grief, but doesn't exactly shout it from the rooftops, does it.
A few questions for the hive mind:
- Has anyone successfully run both assistants simultaneously without wanting to throw the Cerbo overboard?
- Is the consensus just to ditch Virtual Switch entirely and let ESS handle it, or does that open a different tin of worms?
- For those AC-coupling a Fronius or similar on a pure off-grid setup, what's your curtailment strategy actually looking like in practice?
Feels like there should be a cleaner solution and I'm probably missing something obvious — or Victron's assistant stacking is just genuinely a bit of a mess. Wouldn't be the first time.