Been mulling over a similar setup for a project I'm consulting on — a remote highland bothy conversion that currently runs off a diesel three-phase generator with a basic UPS bolted on for the server rack and lighting circuits.
The owner wants to move toward a proper hybrid system, and I've been looking hard at whether a Multiplus II (or a trio of them in three-phase configuration) could slot in cleanly alongside the existing UPS infrastructure without causing headaches at the transfer switching stage.
The core concern I keep coming back to:
- The existing UPS has its own transfer relay logic
- If the Multiplus II is also managing grid/generator input priority, you can end up with two systems fighting over who controls the handover
- Particularly messy when the generator is soft-starting under load
I've dealt with something vaguely similar on my own tiny house setup — single-phase obviously, but the principle of preventing relay conflict between a Victron CCGX-managed Multiplus and an upstream UPS still applies. The answer there was careful use of the AC input current limit settings and disabling certain assistants that were causing false triggers.
On a three-phase highland site with a rotary UPS feeding the generator input, I imagine the phase synchronisation alone adds another layer of complexity.
Has anyone here actually commissioned a Multiplus II three-phase array downstream of an existing UPS? Specifically interested in:
- How you handled transfer relay sequencing
- Whether you used the Victron VE.Bus assistants to manage priority, or went external with a PLC
- Any islanding detection issues with Scottish/rural DNO connections (if grid-tied at all)
Would appreciate input from anyone who's tackled generator-plus-UPS-plus-inverter st