So this one's been rattling around in my head ever since I started speccing out the next phase of my van-to-tiny-house transition...
I'm looking at AC-coupling a Victron MultiPlus-II with an SMA Sunny Boy 3.0 — and honestly, the configuration rabbit hole goes deep. 🕳️
The classic headache is what happens when the grid drops (or in my case, when I'm running fully off-grid): the Sunny Boy needs to see a stable AC reference to stay alive, and the MultiPlus has to do that "pretending to be the grid" trick via its internal frequency shifting to curtail PV output when the batteries are full. Getting those two to play nicely together without the Sunny Boy throwing a strop and disconnecting every five minutes is... an adventure.
Has anyone here actually run this combo in a UK off-grid setup — so no grid at all, not just backup? I'd love to know:
- What firmware versions you're running on both units
- Whether you tweaked the SMA's grid code settings away from the default UK G98/G99 parameters
- If you ended up needing a Victron GX device (CerboGX etc.) in the loop to make frequency shifting reliable
I've seen folks in other threads suggest the ESS Assistant isn't actually the right tool when you're fully off-grid — apparently the AC PV on output assistant behaves better. Can anyone confirm that from real experience rather than forum mythology? 😄
Would love to hear from anyone who's wrestled this particular beast into submission.