Been following a few threads about 3-phase Victron setups lately and it's got me thinking seriously about whether I should go down that route eventually.
Currently running a single-phase Multiplus-II 48/5000 with a Fogstar Drift 48V 100Ah battery — so nowhere near the kind of storage capacity being discussed in some of these larger European installs. My setup powers a static caravan and handles occasional EV top-ups, but I'm increasingly hitting the limits when I want to charge the car overnight and run everything else simultaneously.
A few questions for anyone who's done a multi-unit Victron build:
- Is 3-phase genuinely worth it for a UK off-grid residential setup, or is it mainly relevant when you've got 3-phase loads (workshop machinery, etc.)? Most UK homes and static caravans are single-phase.
- DC cable sizing — I've seen 70mm² mentioned for the 6k5 units. My current 5000 is on 50mm² and I already find the cable runs a bit of a faff. Does anyone have a good UK supplier for decent tinned copper in those heavier gauges?
- Battery bank scaling — before jumping to 50+ kWh, has anyone found a sweet spot for off-grid EV charging without going completely overboard on upfront cost? Fogstar seems the obvious go-to for UK pricing but curious if anyone's compared them against Pylontech for larger banks.
Would be genuinely useful to hear from people who've gone through the upgrade journey rather than just built big from day one.