Been reading up on large 3-phase Quattro setups lately and curious what people's experience is with AC coupling on systems this size.
I'm only running a modest cabin setup myself — single Quattro 5k with a Fogstar 48V pack — but I've been helping a mate plan something considerably bigger. He's looking at a 3-phase arrangement with a decent BYD battery bank and wants to bring in some AC-coupled SMA Sunnyboys alongside DC-coupled MPPTs.
The bit that's got me thinking is the frequency shifting side of things. When the batteries are full and the Quattros start pushing frequency up to throttle the SMA inverters, how well does that actually behave in practice with multiple Sunnyboys across different phases? Seen a few threads suggesting it can get a bit twitchy if the AC-coupled capacity is too high relative to the battery bank.
Also wondering about the MPPT RS units — has anyone run the 450/200 alongside AC coupling on a big 3-phase system? Curious whether the Cerbo GX handles all that coordination cleanly or if you're constantly firefighting with settings.
Not something I'll be doing at my cabin anytime soon but it's the kind of system I'd love to see working properly as emergency backup for a larger property.
Anyone running something similar in the UK? Would be good to know what you'd do differently second time around — particularly around the AC coupling limits and whether the Victron ecosystem handles it all as smoothly as the marketing suggests. 🙂