Currently mid-build on my Ducato and trying to nail down the final panel configuration before the roof brackets go on permanently. Running a Victron SmartSolar MPPT 100/30 and planning four 175W panels (Renogy monos, Voc 24.3V each, Isc 9.47A). The question is whether to wire two 2S strings in parallel (2S2P) or just run all four in series — except obviously four in series would blow past the 100V input limit, so that's out. So realistically I'm looking at 2S2P giving me ~48.6V open circuit and ~19A combined.
The 2S2P setup should sit comfortably within the 100/30's 100V and 30A limits, but I'm a bit wary of mismatched strings causing one to drag the other down if I get partial shading from roof vents or a Webasto fitting. I know the MPPT will just chase one compromise voltage across both strings rather than optimising each independently. A Victron SmartSolar 150/35 would give me the headroom to run a higher-voltage single string, but that's another £60-80 and I'd need different panels.
Has anyone run 2S2P on a 100/30 and actually found shading mismatch to be a meaningful real-world problem, or is it mostly theoretical hand-wringing? Also wondering if bypass diodes in the panels do enough to mitigate it in practice. Concrete data points from actual installs would be far more useful than the usual forum speculation.