Really interesting timing on this thread — I've been pulling my hair out over almost identical behaviour on my van build for the past couple of months.
Running a single Pytes V5 (280Ah) through a Victron SmartShunt and a Cerbo GX, and the SOC readout is frankly useless for capacity planning. The 20% floor is the worst offender — the BMS seems to throttle current draw heavily before the GX even registers low SOC warnings, so you lose a meaningful chunk of usable capacity without any useful heads-up. My 90% ceiling stall is less pronounced but still visible on the VRM graphs as a distinct plateau, usually lasting 20–30 minutes before it climbs through.
A few things worth checking if others are seeing this:
- Charge voltage calibration — I had mine set to 56.8V initially; dropping to 56.4V seemed to reduce the top-end stall slightly
- DVCC settings in Venus OS — make sure the Pytes is actually controlling charge limits via CAN rather than fighting the MultiPlus-II's own absorption settings
- Firmware on the BMS — there's been at least one update floating around that supposedly tightens SOC accuracy, though I haven't verified it improved the stall behaviour specifically
Has anyone with a parallel bank of these (two or more V5s) found the stalling is worse or better than single-unit setups? I'd expect cell balancing across units to smooth it out but I genuinely don't know.
Would be good to hear from anyone running these long-term — are the stall points drifting at all as the cells settle in?