Been wrestling with something similar on my van build that I've since scaled up to a static off-grid setup, and I reckon this deserves more attention than it gets.
Running a Victron Multiplus-II with a Fogstar Drift lithium bank, I noticed that during the Cerbo GX boot sequence, there's a window — maybe 30 to 60 seconds — where DVCC hasn't fully handed control over yet. During that gap, the inverter/charger can behave as if it's operating blind, ignoring the charge current limits the BMS would normally enforce.
For most people this is probably fine. But if your battery bank is already sitting near full SOC when you cycle power, that early uncontrolled charge push could theoretically stress your cells before the BMS gets a word in edgeways.
My questions for the group:
- Has anyone with a multi-unit setup (particularly paralleled or 3-phase Quattros) seen this cause actual problems — voltage spikes, BMS trips, anything logged?
- Is there a reliable way to sequence the boot so the Cerbo is fully initialised before the Quattros start doing anything meaningful?
- Does the DVCC "SVS" or "SCS" mode help here, or does it make the timing issue worse?
I've seen suggestions to use an ESS minimum SOC trick to prevent charging at startup, but that feels like a workaround rather than a proper fix.
Curious whether anyone's dug into the VE.Bus Assistant side of this or set up custom relay logic to handle the sequencing more gracefully. Would love to hear what others have landed on.