Bit of an odd situation I've landed myself in and wondering if anyone's tackled this before.
I've got a Victron Multiplus-II 48V sat in my garden office setup, and I'm looking to expand capacity without replacing what I've already got. Currently running a 100Ah LiFePO4 pack (Fogstar Drift cells) but I've been offered a decent price on a second-hand 48V pack from a different manufacturer — different chemistry specs, slightly different charge voltages, and obviously its own BMS.
The question is whether it's viable to run both packs in parallel from a single AC-coupled system, or whether the two BMSs fighting over charge/discharge thresholds is going to cause headaches long-term. I've read conflicting things — some say as long as the resting voltages are close enough it's broadly fine, others say you're just asking for one BMS to constantly cut out while the other does all the work.
A few specific things I'm uncertain about:
- Does the Multiplus-II care about seeing two separate BMSs via DVCC, or does it just follow whoever's shouting loudest?
- Is there a practical way to balance the state of charge before paralleling them up?
- Anyone running something like this in a van conversion or similar space-constrained setup where replacing the whole bank isn't realistic?
Feels like the kind of thing that should work in theory but has a hundred ways to go wrong in practice. Would be curious whether anyone's actually lived with a mixed-pack parallel setup rather than just theorised about it.