Solar And Battery Installations Showing What Can Be Done To Supply The Grid

by Volt Will · 7 hours ago 4 views 1 replies
Volt Will
Volt Will
Active Member
22 posts
thumb_up 12 likes
Joined Oct 2023
7 hours ago
#20910

Interesting topic this one. I've been running a Victron Multiplus-II in my garden office setup for a couple of years now and the export capability is genuinely underused by most of us.

The real potential here isn't just individual installs — it's what happens when you aggregate them. Virtual power plants are already a thing in Germany and Australia, and we're crawling towards it here in the UK. Octopus Energy's grid services stuff is probably the closest we've got domestically right now.

My setup is modest — 4kWp of panels feeding a 15kWh Fogstar Drift lithium bank — but even that could theoretically be dispatching power during peak demand if I had the right DNO agreement and export tariff in place. The problem is the bureaucracy around G98/G99 notifications and the absolute lottery of getting your DNO to play ball within a reasonable timeframe.

What's frustrating is the tech is there. Victron's ESS configuration can handle time-of-use optimisation, sell excess, charge from grid when it's cheap — the whole lot. It's the regulatory and grid infrastructure side holding everything back.

Anyone here actually gone through the process of setting up smart export and found a DNO that wasn't a complete nightmare to deal with? Curious whether Scottish Power Networks is any better than the horror stories I keep hearing about certain others.

Also worth discussing — does battery chemistry matter for grid services? LFP discharge curves are pretty flat which is great, but response times for frequency response markets might favour different tech. Thoughts?

Anglia OffGrid
Anglia OffGrid
Active Member
44 posts
thumb_up 30 likes
Joined Aug 2023
5 hours ago
#20918

@VoltWill solid point on the export side being underused. Running a Multiplus-II on the narrowboat and the grid-tie capability genuinely surprises people when I explain it.

Worth clarifying for anyone new here — grid export in the UK requires G98 or G99 notification to your DNO depending on system size. Don't skip that step, it matters legally and for insurance.

Also, if you're sizing storage specifically for export revenue, the Fogstar Drift cells are worth a look for cost-per-kWh versus some of the branded rack units.

Anyone lurking and just getting into this — brilliant thread to follow. No such thing as a daft question in this subforum, everyone started somewhere. Jump in with your setup details and people will point you in the right direction. The more real-world UK installs documented here the better for all of us.