Been mulling over relocating my Multiplus-II setup and wondered if others have gone through similar upheaval.
My current arrangement has the inverter/charger in the utility room, which made sense when I first installed everything — easy access, close to the consumer unit, simple cable runs. But the setup has grown considerably since then (added a Cerbo GX, expanded the Fogstar battery bank to 15kWh) and it's starting to feel cramped and frankly a bit domestic-unfriendly. Partner's patience is wearing thin with the blinking lights and occasional fan noise.
The obvious solution seems to be moving the whole lot into an outbuilding, maybe 8–10 metres from the incoming supply. A few things I'm genuinely unsure about though:
- Cable sizing — at that distance with a 5kVA unit, am I looking at 35mm² or 50mm² DC cabling between the batteries and inverter? Voltage drop is my main concern.
- Environmental considerations — shed will get cold in winter. Fogstar cells have charging cutoffs below 0°C, so do people run low-power heating in the outbuilding, or just let the BMS handle protection?
- ESS configuration — does moving the unit physically change anything in the ESS assistant setup, or is it purely a physical/wiring job once you've got the grid connection sorted?
Has anyone relocated an existing ESS installation rather than starting fresh? Wondering whether it's worth a full recommission through a registered electrician or if a competent self-installer can manage the transition sensibly.
Happy to share what I end up doing if there's enough interest — feels like a gap in the forum knowledge base for UK installs specifically.