Anyone else wrestling with getting dynamic ESS to play nicely with peak shaving on a Victron setup?
Running a Multiplus-II 3kVA at the static caravan with a Fogstar 10kWh lithium pack and a couple of Victron SmartSolar MPPTs — all tied together through VRM. Works a treat most of the time, but I'm trying to nail down variable peak shaving limits rather than one fixed threshold.
At the moment I've got peak shaving capped at roughly 13A/3kW through VRM, which stops me hammering the grid connection (dodgy supply out here in the sticks). Problem is, that limit feels too conservative on a sunny afternoon when the batteries are rammed and too aggressive on a gloomy January morning when the pack is sat at 20%.
What I actually want is for the peak shaving threshold to flex based on state of charge — so it's more aggressive when the battery is healthy and backs off when reserves are low. Is that achievable through the dynamic ESS settings, or am I dreaming?
I've had a poke around in the Node-RED flows on the Cerbo and suspect the answer lives in there somewhere, but my programming skills peaked around 1987 on a BBC Micro.
Has anyone actually got dynamic peak shaving limits working in a UK setup — ideally without needing a computer science degree? Any VRM schedules, Node-RED templates, or even just a sensible workaround would be brilliant.