Been running a Victron Multiplus-II 48/5000 for about eight months now, primarily for whole-home backup and to take advantage of off-peak Octopus Go rates overnight. Works brilliantly for that use case.
Recently I've been looking at adding some plug-in (balcony-style) solar panels to the mix — the 800W limit that's currently proposed under the UK's microgeneration rules seems workable as a starting point. My question is around how the Multiplus actually handles this input.
If I'm running loads from the inverter and simultaneously feeding in from a plug-in array connected to the AC output side (ESS setup), does the Victron ESS assistant properly account for that generation, or does it just see reduced consumption from the grid and potentially create conflicts with the charge/discharge logic?
Has anyone here actually done this? A few things I'm unsure about:
- Does the CT clamp placement matter more in this scenario?
- Would a Fronius or even a cheap grid-tie microinverter on the AC output side cause any instability?
- Is there a risk the Multiplus tries to "fight" the plug-in inverter?
I've seen some discussion from US users running split-phase Multiplus setups with plug-in arrays, but their grid config is obviously quite different from our 230V single-phase setup, so I'm not sure how directly that translates.
Anyone running something similar in the UK — particularly with an Octopus tariff in the mix — who could share how they've configured it?