Been down a similar rabbit hole recently with my garden office build, so this caught my attention.
I'm running a Lynx BMS (older non-NG) with a set of Fogstar Drift cells rather than a native Victron battery bank. The SoC reset thresholds — specifically the voltage-based full charge detection — seem to behave oddly when you're not using a supported BMS-integrated pack. It'll occasionally refuse to reset to 100% even after a proper absorption cycle, leaving the MPPT and inverter making decisions based on a stale SoC figure.
What I think is happening:
- The Lynx BMS expects a charge current tail signal that only native Victron batteries (or properly integrated third-party packs via VE.CAN) provide
- Without that handshake, the voltage threshold alone isn't consistently triggering the reset
- The workaround I've been using is setting a tighter absorption voltage in VEConfigure and manually nudging the SoC via VRM when it drifts badly — not ideal, obviously
Has anyone found a cleaner fix? I've seen suggestions about setting the [BMS] SoC reset voltage parameter directly in the Lynx config via MPPT, but documentation for the non-NG version is genuinely sparse. The Victron community forum has some threads but most reference the NG hardware.
Would be particularly interested if anyone's got this working reliably with non-Victron LiFePO₄ — Fogstar, EG4, or similar. Feels like a gap in Victron's documentation that punishes anyone not buying a full Victron ecosystem, which isn't always realistic at UK pricing.