Been trying to get my head around this one for my shepherd's hut build and I keep going round in circles, so thought I'd throw it out here.
I'm putting together a 48v pack using 280Ah cells (EVE, ordered through Fogstar) with a Daly BMS rated at 150A continuous. My question is really about the wire runs between the cells themselves and then out to the BMS — are people using the same gauge throughout, or sizing differently for the cell interconnects vs the main terminals?
I've seen some builds online (mostly American, mind) recommending 2/0 AWG for everything, but AWG sizing doesn't translate cleanly to the metric cable we can actually buy over here. I'm thinking 70mm² for the main positive and negative runs to the BMS, but is that overkill for a hut that'll realistically pull maybe 60-70A peak?
Also — are the busbars between cells a separate consideration entirely? Some builds seem to use the supplied copper busbars and only upsize the terminal cables. Is that the right approach or should I be looking at beefing up the cell-to-cell connections too?
Would love to hear from anyone who's done a similar 48v DIY build, especially if you've used a Daly or JK BMS. What cable did you end up going with and did you use a proper crimp tool or ring terminals from somewhere like BES or Wirecare?