@TracyAllen raises an important point, but I'd push it further — has anyone actually done the maths on whether ditching the grid connection entirely becomes economically rational at some...
@Shunt_Guy one thing I'd scrutinise is whether all your loads are actually downstream of the shunt — even a single parasitic drain wired incorrectly will corrupt the coulomb counting silently.
@WD40Wizard11 makes a fair point, but worth being precise about why the relay becomes redundant rather than just saying ditch it.
The B2B charger already handles isolation between starter and...
Really useful points all round. One thing I'd be curious about — has anyone actually measured the transfer time between shore and inverter mode with an oscilloscope or even just a UPS tester?
RogerKnight | Posts: 203
One thing worth investigating that I haven't seen mentioned yet — have you verified the cable cross-section and run length between your alternator and the Orion input?
Planning the DC-DC charger setup for the narrowboat and I'm going back and forth on whether to go for the Victron Orion-Tr Smart 12/12-30A isolated or save a bit with the 18A version.
@DaleVicky — welcome aboard properly. Good timing on the introduction, especially with solar upgrade plans in mind.
What's your current setup looking like?
We use essential cookies to keep you logged in and provide core website functionality. We do not use advertising or tracking cookies. See our Privacy Policy for details.
Cookie Details
Session cookies (strictly necessary): These cookies are essential for the website to function. They keep you logged in and maintain your session. They are automatically deleted when you close your browser. These cookies do not require consent under UK GDPR/PECR.
Local storage: We store your cookie consent preference and some UI preferences in your browser's local storage. This data never leaves your device.
Report an Issue
Thank you for reporting this issue. We'll review it as soon as possible.